Total channelization: the concrete jacket
The 'Typical Proposed Cross Section' traps the river inside a fixed engineering structure. The bed, the banks and the foundations are all drawn as built work.
- Paving the flow bed. The central bed is 70 m wide, and the drawing labels that entire span for C.C M30 grade concrete and P.C.C 1:3:6. The natural riverbed of sand, rock and silt is replaced by a permanent, reinforced concrete floor.
- The symmetrical slope. The banks are redesigned as uniform engineered inclines, lined with concrete and 'filter media'. These are not natural earthen banks. They hold the river in a perfect trapezoid.
- Structural anchors. Toe walls, the foundation blocks shown in dark blue and yellow, anchor the concrete slopes deep into the ground. After that the river cannot meander or widen on its own.